Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

November 21, 2024

June 27, 2025

Multiple Locations

Site Work

No Information to Display

$3,400,000.00

Public - City

img_map_placeholder

Multiple Locations, Miami Beach, FL

64

6

2

6

Subscribe to View Full Documents

In accordance with recommendations in the City's Water Master Plan and Sewer Master Plan, the scope of this project includes the installation of approximately 1,300 linear feet (LF) of a subaqueous 12-inch inside diameter (ID) High-Density Polyethylene (HDPE) force main via Horizontal Directional Drilling (HDD) and the installation of approximately 725 LF of a subaqueous 10-inch HDPE water main via Horizontal Directional Drilling (HDD). These new portions of force main and water main will relocate and replace the existing subaqueous crossings. The project also includes the installation of approximately 2,360 LF of 10-inch Polyethylene Chloride (PVC) C-900 force main that will be installed via an open trench in order to connect the proposed force main to the existing system at the North and South ends of the project. In addition, approximately 100 LF of 8-inch Ductile lron (Dl) water main will be installed via an open trench, in order to connect the proposed water main to the existing system at the north and south ends of the project. The work set forth within these contract documents includes the furnishing of all labor, materials, equipment, services, and incidentals necessary to complete the required work described here, including all appurtenant work, complete, tested, and ready for operation, including temporary utilities and facilities as required, all surveying work for layout construction and as-builts, all in conformance with these Contract Documents and City of Miami Beach Public Works Standards. Question Deadline 08/30/2024 at 5:00 PM ET Questions will be allowed up to 10 days before the initial deadline for submittal of Bids. Questions must be directed to Julissaperez@miamibeachfl.gov, with a copy sent to the City Clerk rafaelgranado@miamibeachfl.gov. Project Site: Sunset Islands 2 and 3 (Approximately from 2288 SUNSET DR, along Sunset Drive, along Lake Avenue, along W 27th Street, along W 23rd Street to 2700 SUNSET DR) 1. Failure to achieve Substantial Completion: $4,722.22/day 2. Failure to achieve Final Completion: $4,722.22/day Days for Substantial Completion: 180 days Days for Final Completion: 40 days Total Project Duration: 220 days

72 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.