Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 28, 2024

December 27, 2024

December 17, 2025

Multiple Locations

Site Work

No Information to Display

$4,795,698.00

Public - City

img_map_placeholder

Multiple Locations, Miami Beach, FL

61

14

3

Subscribe to View Full Documents

Water Main Replacement - Fire Flow Package #1 Question Deadline 10/14/2024 at 5:00 PM ET Questions will be allowed up to 10 days before the initial deadline for submittal of Bids. Questions must be directed to Julissaperez@miamibeachfl.gov, with a copy sent to the City Clerk rafaelgranado@miamibeachfl.gov. The scope of Work for the above-referenced Fire Flow Projects is as recommended in the Citys Water System Master Plan dated October 2019 for fire flow improvements within the City Center Neighborhoods. The work includes the installation of approximately 7,650 Linear Feet (LF) of zinccoated and poly-wrapped ductile iron water mains up to 16" in diameter to meet fire flow pressures. The Work to be performed under this Contract shall consist of furnishing all equipment, materials, supplies, and manufactured articles, for furnishing all transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, Work or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. Neighborhood: Flamingo Lummus. This project entails the replacement of the existing water mains along the following corridors: 14th Street and 13th Street, from Alton Rd. to Michigan Ct. Michigan Ct. from 13th St. to 14th St. 10th St. from Alton Rd. to Washington Ave. 8th St. from Lenox Ave. to Michigan Ct. Lenox Ave. from 9th St. to 8th St. Michigan Ct. from 8th St. to 6th St. 7th St. from Alton Rd. to Jefferson Ct.

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.