Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 18, 2024

October 18, 2024

July 15, 2025

To Be Determined

Paving, Site Work

No Information to Display

$500,000.00

Public - Federal

img_map_placeholder

To Be Determined, Paris, AR

7

27

2

4

Subscribe to View Full Documents

All work to be performed under the awarded contract will be in accordance with requirements, including specifications and drawings provided for this project. Project Title(s): Spring Lake Dam (SLD) Pedestrian Walkway Improvements Original Set Aside: Total Small Business Set-Aside (FAR 19.5) NAICS: 237990 - Other Heavy and Civil Engineering Construction / PSC Z2KA Repair Or Alteration Of Dams $45M This is a Invitation for Bid (IFB) will result in award of a firm-fixed price contract. Award will be made using a Lowest Price responsive/responsible evaluation. Magnitude: (d) Between $250,000 and $500,000. Location(s): This project area is in the Spring Lake Recreation Area, approximately 4 miles north of Belleville, Arkansas; in Section 27, Township 6 North, Range 23 West, Yell County, Arkansas Scope of Work (summarized): This project includes improvements to the Spring Lake Dam Recreation Area Pedestrian Walkway. The project includes replacement of the existing concrete walkway, improves safety features including the handrails, replaces an existing potable waterline, and rehabilitates the existing Dam stone masonry piers. The original masonry gravity dam structure, located on the southerly end of Spring Lake, was built in 1938. The existing walkway is sited on top of the dam. The walkway is supported on the dam's stone and mortar piers which includes a total of 15 spans. The walkway was constructed of reinforced, poured in place, concrete panels which sit on concrete edge beams. These edge beams are embedded into the stone piers at the ends. The walkway sides have handrails and chain-link fencing. SCHEDULE: SITE VISIT: 8/23/2024; Time: 10:00 CT; Location: Spring Lake Dam Recreation Area Pedestrian Walkway POC: POC: Scott Leonard, 479-438-9387, scott.leonardusda.gov LAST DAY FOR QUESTIONS: 9/05/2024 BIDS DUE: 09/18/2024 1200CT PERIOD OF PERFORMANCE: 270 Days (negotiable) Submittal Method: All bids will be emailed to steven.alvesusda.gov; cc: cynthia.grandersonusda.gov. You may call 859-334-0524 to confirm receipt *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects