Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2024

December 23, 2024

March 12, 2027

2020 Wake Ave

Demolition, Renovation, Site Work

No Information to Display

$10,000,000.00

Public - County

img_map_placeholder

2020 Wake Ave, Oakland, CA

56

41

91

5

Subscribe to View Full Documents

The District will take photographs, as requested by the Attendees, restricted to the work zone. The District will release photographs to Attendees after the bid walk, pending review by District. All Attendees are required to have a photo ID and sign a confidentiality agreement not to share, sell, or publish photos. The Prime Contractor and its subcontractors are strongly encouraged to attend the jobsite inspection where a "sign-in" sheet will be provided. Requirements of the District's Contract Equity Program, including the pilot Local Hire component, will be discussed and explained at the pre-bid meeting. The District will conduct a MANDATORY pre-bid jobsite conference/inspection to familiarize prospective bidders with the project site and conditions. Bidders submitting a bid must attend the pre-bid conference for their bid to be responsive. Attendees will be required to sign a waiver prior to entering the plant site. Work includes demolition and replacement of motors, valves, instruments, controls, and other appurtenances associated with the cryogenic oxygen production facility at East Bay Municipal Utility District's Main Wastewater Treatment Plant (MWWTP). Existing pneumatic controls will be replaced with new electronic instruments and controls. The work also includes re-coating of existing steel cold boxes, new controls, integration of controls into the MWWTP's distributed controls system (DCS), fire protection, fall protection, seismic retrofit of panels, and all materials, equipment, services, and construction inherent to the Work. A bidder's bond for not less than 10% of the total bid dollar amount is required. Performance and payment bonds for not less than 100% of the contract price are required. As provided in Section 22300 of the Public Contract Code of the State of California, the Contractor may substitute securities for monies withheld by the District to ensure performance of the work. A bidder's bond for not less than 10% of the total bid dollar amount is required. Performance and payment bonds for not less than 100% of the contract price are required. As provided in Section 22300 of the Public Contract Code of the State of California, the Contractor may substitute securities for monies withheld by the District to ensure performance of the work. $9,000,000 to $10,000,000 Question Deadline 08/30/2024 Questions regarding documents, discrepancies, omissions, or intent of specifications or drawings shall be communicated to the Engineer in writing. EMAIL questions to jlaw@ebmud.com. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document..

30 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.