Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 21, 2024

September 20, 2024

September 20, 2025

N Rowlett St

Paving, Site Work

No Information to Display

$1,879,239.00

Public - City

img_map_placeholder

N Rowlett St, Collierville, TN

36

20

2

3

Subscribe to View Full Documents

This project shall consist of traffic control, saw cutting asphalt, saw cutting of concrete, excavation of material, installation of water main, backfilling, testing of water main, installation of water services, installation of meter boxes, finish grading, concrete work, sodding and other items of work for a completed project. Project Description: A. The work consists of the furnishing and installation of a Ductile Iron Pipe (I as called for on the plans with all labor, materials and appurtenant completed project. X Ç)>Water Main required for a B. Shop drawings and materials must be submitted and approvedwthe Town prior to use in the project. C. The backfilling of all pipes shall be per ed dr lown in the plans. This includes and all excess soil and asphalt are to be removed from the project There is no storage on site. The Contractor is responsiblefc excavated material. E. The Contractor for the safety and protection of all persons, property and witfîjiis or her work. F. The worleileclej trash; mud will not be allowed on existing roadways. G' construction schedule at the preconstruction conference lead fames. No Notice to Proceed shall be issued without a O1 J. hall insure that work area is clear of encroachment into property outside rights-of-way. nractor shall not close off the use of public facilities until the completion of one construction and provides an alternative usage approved by the Town. The Contractor shall notify the Town seven days prior to closing a road. K. All work shall be constructed as per the Town of Collierville Construction Standards. L. The Contractor shall notify the Town Engineer 72 hours (3 days) in advance of any intersection closure. M The Contractor shall be responsible for acquiring storage areas for construction. N. Weekend Work: No weekend work allowed unless extenuating circumstances require it with approval of the Town Engineer. 0. A Notice to Proceed will be provided at the start of each phase. Substantial Completion will be provided at the end of each phase. Substantial Completion will be completed on the prior phase before the Notice to Proceed is provided for the next phase. Liquidated Damages will be assessed for each phase. Refer to the Special Provisions (Phases of Work) section for the exact number of days to complete each phase of work. The entire project has a Substantial Completion of three hundred sixty-five (365) consecutive calendar days.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.