Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

November 1, 2024

June 13, 2025

To Be Determined

Outdoor Lighting, Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

To Be Determined, Sherman, TX

36

17

4

7

Subscribe to View Full Documents

Pecan Grove East Park Improvements. Question Deadline 09/03/2024 at 5:00 PM CT The deadline to ask questions at online. Scope The Work includes: selective site demolition and haul away, erosion control, tree protection/preservation, new prefabricated restroom facility (facility, materials and installation by Romtec), new playground improvements (playground structure, playground surfacing, playground installation and playground drainage by Whirlix), new water/sewer/electrical utilities including lift station, parking lot expansion, parking guard railing expansion, landscape sub-surface drainage and outfall structures, concrete patios, concrete walks, concrete trails, park areas, trail areas and parking lot lighting, lighting concrete piers, lighting trenching, electrical service for lighting, restrooms, and lift station, barrier free ramp expansion, landscape (sod replacement only), irrigation (temporary watering only for establishment), mass grading, fine grading and grading for drainage, site clearing and demolition and all other systems, parts and appurtenances detailed in the construction documents and technical specifications. The contractor shall have 270 calendar days to complete the project.

109 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.