Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2024

October 21, 2024

August 8, 2025

100 School St

New Construction, Site Work

No Information to Display

$1,632,172.00

Public - City

img_map_placeholder

100 School St, Koshkonong, MO

36

19

20

5

Subscribe to View Full Documents

Middle School Storm Shelter Hourly wages, as set forth by the Department of Labor and Industrial Relations and the prevailing wage law, will be complied with on this project. Performance Bond and Material and Labor Payment Bond in amount of 100% of contract price shall be furnished by successful bidder. If the Contractor refuses, neglects, or fails to complete the Work within the time stated in the Contract, then the Contractor and the Contractor's surety, if any, shall be liable for and shall pay the Owner, not as penalty but as liquidated damages, the sum of four hundred dollars ($400.00) for each calendar day that the Contractor is in default after the time stipulated in the Contract for completing the Work of each Phase until the Work is Substantially Complete. The Owner may withhold from payments due the Contractor, such amounts as may be assessed as liquidated damages. Upon Substantial and Final Completion of the Work, the Owner may adjust the Contract Sum by the amount of the assessed liquidated damages. Construction Schedule: Construction Schedule may start immediately and must be substantially complete by August 8, 2025. The Board reserves the right to accept or reject any or all bids and waives any informality in the bidding. Each bidder shall examine the bidding documents carefully and no later than seven days prior to the date for receipt of bids and shall make written request to the Architect for interpretation or correction of any ambiguity, inconsistency or error therein discovered. All roofs shall be laid to provide weather tight and waterproof covering for all areas roofed and all walls, chimney, vents, ventilators, hangers, braces, guy wires, frames and canopies shall be covered in such manner and in conjunction will act integrally to meet this condition. A. Provide all labor, material, tools, equipment, and supervision necessary to complete the installation of a .060 inch thick reinforced white TPO adhered Roofing System including flashings and insulation as specified herein and as indicated on the drawings in accordance with the manufacturer's most current specifications and details. B. The roofing contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work. Question Deadline 08/15/2024 Bid Result : Contractor - Gentry Construction Inc - $ 1,799,000.00 Hardware Contractor - Ron Miller Hardware - $18,825

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects