Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

October 4, 2024

No Information to Display

1700 S River Rd

Renovation

No Information to Display

$30,000.00

Public - County

img_map_placeholder

1700 S River Rd, Saint Charles, MO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe to View Full Documents

Juvenile Justice Stainless Steel Toilet and Sink Installation. St. Charles County Facilities Department is looking to install new stainless-steel toilets and sinks in the Juvenile Detention Center. The current fixtures are porcelain. There are a total of twenty-two (22) toilets and twenty-six (26) sinks that need replacing. Because the fixtures are within detention, a site visit must be coordinated to ensure the appropriate material is quoted. The stainless-steel toilets are Metcraft model R4610-FV-5.5-0001, or suitable alternative. See Exhibit B The stainless-steel sinks are Acorn Penal-Ware 1657 series 18" multi-sided lavatory with oval bowl, or suitable alternative. See Exhibit B All costs should include the following: 1. Demolition, removal, and disposal of existing porcelain fixtures. 2. Adjustments of existing rough ins to allow for installation of new fixtures. 3. Any finish work necessary to conceal or close any gaps or penetrations created from removal of previous porcelain toilets, or that were required to install new units. This includes any wall, ceiling, or floor repair. Finish work includes any painting or surface repair to match original paint or surface. 4. Any additional work necessary for the new units to be installed, such as plumbing, electrical, support/bracing, backing, or any other modification that is required to properly install each unit. 5. Shipping, delivery, installation, and testing of the new units. Contractor is responsible for cleaning up and removing all debris resulting from the work. Contractor is responsible for providing dumpster for removal of all trash and debris associated with this work. Dumpster location must be coordinated and approved by the County. Contractor will not be permitted to leave any items unattended in the detention area while work is performed and must clear all tools, material, debris, or other items each day the work is ongoing to adhere to security restrictions. St. Charles County has the right to accept and/or reject any and all bids.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects