Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 3, 2024

October 3, 2024

November 24, 2025

To Be Determined

Site Work

No Information to Display

$259,670.00

Public - Federal

img_map_placeholder

To Be Determined, Hamilton, MT

17

10

10

4

Subscribe to View Full Documents

PROJECT DESCRIPTION: The project is for the removal of an existing 35-ft single log foot bridge over Little Rock Creek on Forest Service Trail #580 at milepost 2.87, and installing a new 41-ft glulam stringer pack/pedestrian trail bridge with rock-filled gabion basket foundation. This project includes: 1) Dispose of an existing approximate 35-ft long single log foot bridge, 2) Construction of a new 41-ft, glulam stringer bridge, including associated trail approach work, footings, and drainage improvements. PROJECT LOCATION: This project is located at milepost 2.87 over Little Rock Creek on Forest Trail # 580 on the Darby Ranger District, USFS, in Ravalli County, MT, Section 35, Township 4 North, Range 22 West. The project is approximately 3 miles west of the Lake Como Recreation Area, which is located approximately 8 miles northwest of Darby, MT. This project is located three miles from the closest road. Helicopter flights and mechanized/motorized use is allowed at the site. There is no vehicular access to the bridge site. PERIOD OF PERFORMANCE: It is anticipated that work can begin September 15, 2025 with work being completed by November 14, 2025. Contract period of performance is 60 days. MAGNITUDE OF CONSTRUCTION (per FAR 36.204(b)): Between $100,000 and $250,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.