Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 22, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$2,000,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Devils Lake, ND

Our team is requesting plans for this project.

Subscribe to View Full Documents

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Full and Open Competition with HUBZone price preference PROJECT NUMBER: ND FTFW WHHI 10(5) PROJECT NAME: WHITE HORSE HILL NGP AUTO TOUR ROUTE PROJECT DESCRIPTION: The project is located in the White Horse Hill National Game Preserve (formerly Sully's Hill NGP) in central North Dakota approximately 10 miles south of the city of Devils Lake, ND. SCOPE OF THE WORK: The purpose of this project is to improve overall access, safety, and experience for refuge visitors. The project consists of road improvements to rehab/resurface the two lane portion (1.5 mi.) of the asphalt paved Auto Tour Route (Rte #010) along with the White Horse Hill Overlook Loop (Rte #011) and the Prairie Dog Town Access Road (Rte #101) to prevent the roads from further decline. The Auto Tour Route is crumbling along the edges of the roadway and developing cracks in many locations that span the entire width of the road. The overlook loop portion of the route has been previously chip sealed. Route 010AZ Auto Tour Route and Route 010BZ White Horse Hill Overlook Loop are pavement preservation efforts that will not change the horizontal or vertical alignments. Route 101 Prairie Dog Town Access Road is a 3R effort. The typical sections for this project will match existing roadway widths. Route 010AZ and 010BZ will include two new round grate cattle guards each (total of 4). New centerline striping for Route 010AZ will be included. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: o 180 Square Yards Asphalt Concrete Pavement Patch, Type 1 o 250 Square Yards Asphalt Concrete Pavement Patch, Type 2 o 28,400 Square Yards Chip Seal, Type 1 D o 2,100 Tons Aggregate Surface Course ANTICIPATED SCHEDULE: Advertisement - October 2024 Award-December 2024 Construction - June 2025 through September 2025 ESTIMATED COST RANGE: Between $700,000 and $2,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.