Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 14, 2024

November 27, 2024

September 24, 2029

Multiple Locations

Paving, Site Work

No Information to Display

$37,100,000.00

Public - City

img_map_placeholder

Multiple Locations, San Diego, CA

8

9

9

8

Subscribe to View Full Documents

PREVAILING WAGE RATES APPLY TO THIS CONTRACT Refer to Attachment D. LICENSE REQUIREMENT To be eligible for award of this contract, Prime contractor must possess the following licensing classifications: A or (C-34 and C-42) ESTIMATED CONSTRUCTION COST The Citys estimated construction cost for this project is $37,100,000.00. SLBE participation 9.0% 2. ELBE participation 13.3% 3. Total mandatory participation 22.3% Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% SCOPE OF WORK: Construction of AC Water & Sewer Group 1049 consists of the installation of approximately 26,796 linear feet (5.08 miles) of replace-in-place, realigned, and new 8-inch, 12-inch and 16-inch water main and installation of approximately 3,223 linear feet (0.61 miles) of replacein-place and realigned 8-inch and 10-inch sewer mains, and rehabilitation of approximately 2,458 linear feet (0.47 miles) of 8-inch and 15-inch sewer mains. Related work includes potholing, water and sewer main abandonment, replacement of water services and laterals, fire hydrant installation, traffic control, street resurfacing, curb ramp installation, traffic striping, and construction best management practices (BMPs). 1.1. The Work shall be performed in accordance with: 1.1.1. The Notice Inviting Bids and Plans numbered 41460-01-D through 41460-71-D, Traffic Control Plans numbered 41460-T1-D through 41460-T225-D, and Bike Lane Striping and Electrical Plans: Balboa Avenue Kearny Villa Road to View Ridge (100499-1-D through 100499-16- D), Convoy St Aero Drive to Kearny Mesa Road (100499-17-D through 100499-23-D), Kearny Mesa Road Convoy St to Balboa Ave (100499-24-D through 100499-33-D), Kearny Villa Road I-805 to Tech Way (100499-34-D through 100499-54-D), Othello Ave Convoy St to Kearny Mesa Road (10499-55-D through 104999-59-D) inclusive. For the above specified plans refer to the following link: https://drive.google.com/drive/folders/1kczpnVFHmx2JFZtnFSkebCC7o8XZ3mYa

110 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects