Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 14, 2024
November 27, 2024
September 24, 2029
Multiple Locations
Paving, Site Work
No Information to Display
$37,100,000.00
Public - City
Multiple Locations, San Diego, CA
PREVAILING WAGE RATES APPLY TO THIS CONTRACT Refer to Attachment D. LICENSE REQUIREMENT To be eligible for award of this contract, Prime contractor must possess the following licensing classifications: A or (C-34 and C-42) ESTIMATED CONSTRUCTION COST The Citys estimated construction cost for this project is $37,100,000.00. SLBE participation 9.0% 2. ELBE participation 13.3% 3. Total mandatory participation 22.3% Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% SCOPE OF WORK: Construction of AC Water & Sewer Group 1049 consists of the installation of approximately 26,796 linear feet (5.08 miles) of replace-in-place, realigned, and new 8-inch, 12-inch and 16-inch water main and installation of approximately 3,223 linear feet (0.61 miles) of replacein-place and realigned 8-inch and 10-inch sewer mains, and rehabilitation of approximately 2,458 linear feet (0.47 miles) of 8-inch and 15-inch sewer mains. Related work includes potholing, water and sewer main abandonment, replacement of water services and laterals, fire hydrant installation, traffic control, street resurfacing, curb ramp installation, traffic striping, and construction best management practices (BMPs). 1.1. The Work shall be performed in accordance with: 1.1.1. The Notice Inviting Bids and Plans numbered 41460-01-D through 41460-71-D, Traffic Control Plans numbered 41460-T1-D through 41460-T225-D, and Bike Lane Striping and Electrical Plans: Balboa Avenue Kearny Villa Road to View Ridge (100499-1-D through 100499-16- D), Convoy St Aero Drive to Kearny Mesa Road (100499-17-D through 100499-23-D), Kearny Mesa Road Convoy St to Balboa Ave (100499-24-D through 100499-33-D), Kearny Villa Road I-805 to Tech Way (100499-34-D through 100499-54-D), Othello Ave Convoy St to Kearny Mesa Road (10499-55-D through 104999-59-D) inclusive. For the above specified plans refer to the following link: https://drive.google.com/drive/folders/1kczpnVFHmx2JFZtnFSkebCC7o8XZ3mYa
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
San Diego, CA
Bid Date: Oct 04 2024
San Diego, CA
Bid Date: Oct 17 2024
San Diego, CA
Bid Date: Sep 13 2024
San Diego, CA
Bid Date: Sep 19 2024
San Diego, CA
Bid Date: Oct 17 2024
San Diego, CA
Bid Date: Oct 07 2024
San Diego, CA
Bid Date: Sep 19 2024
San Diego, CA
Bid Date: Aug 28 2024
San Diego, CA
Bid Date: Sep 26 2024
San Diego, CA
--
San Diego, CA
Bid Date: Sep 19 2024
San Diego, CA
Bid Date: Oct 17 2024
San Diego, CA
Bid Date: Sep 20 2024
San Diego, CA
Bid Date: Sep 20 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
