Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 1, 2026

No Information to Display

1400 3rd Ave N

Renovation

No Information to Display

$450,000.00

Public - City

img_map_placeholder

1400 3rd Ave N, Naples, FL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Update:https://www.naplesgov.com/media/154501 This request will accommodate the ongoing replacement of pumps, motors and drives that have met their useful life and cannot be rebuilt within the Wastewater Treatment Plant. The cost of the pumps, motors and drives within the Wastewater Plant range from $25,000 to $100,000 each (50HP - 600 HP). FY 2023-24 will allocate funding for the replacement of multiple pumps, motors and drives throughout the facility. Future years are projected for the on-going replacement of pumps, motors and drives that operate within the Plant. Project is included City of Naples Fiscal Year 2025-2029 Page no 72 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This request will accommodate the ongoing replacement of pumps, motors and drives that have met their useful life and cannot be rebuilt within the Wastewater Treatment Plant. The cost of the pumps, motors and drives within the Wastewater Plant range from $25,000 to $100,000 each (50HP - 600 HP). FY 2023-24 will allocate funding for the replacement of multiple pumps, motors and drives throughout the facility. Future years are projected for the on-going replacement of pumps, motors and drives that operate within the Plant. The project is include in the city's 2024-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.