Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 1, 2026

No Information to Display

To Be Determined

Renovation

No Information to Display

$925,000.00

Public - City

img_map_placeholder

To Be Determined, Naples, FL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Wastewater Collection Divisions operates an eight (8) bay vehicle storage barn. The facility was constructed in the late 1980's and has had several improvements over the years. The facility is currently requiring garage door replacements (8 doors) in order to meet current wind load requirements, replacement of the rain gutters, and miscellaneous roof repairs. FY 2021-22 initially contained funding for the actual improvements. Upon the project commencing, it was determined that engineering services would be required to address building improvements associated with greater deterioration of the wall skins and roll-up door jams than what was originally expected. The engineer completed the WWC facility evaluation in August 2023; cost to repair the facility was estimated at $684,000. Staff is securing the necessary engineering services in FY 2024-25 to account for design services for these improvements, with intentions to allocate funding for construction in FY 2025-26. FY 2026-27 contains funding for the roof replacement of the WWC Administrative building. As of September 20, 2024, this project is included in the city's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.