Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
January 25, 2024
February 26, 2024
September 17, 2025
Multiple Locations
Paving, Renovation, Site Work
No Information to Display
$690,000.00
Public - City
Multiple Locations, Barneveld, WI
Wellhouse #3 and Ground Reservoir The work for which bids are asked includes the following: Construction of a Wellhouse No. 3 including well pump, power systems, controls, standby power generator, process mechanical piping, concrete ground reservoir, and booster pump system. The wellhouse facility consist of masonry block construction; the building will contain the municipal well, electrical, controls, HVAC, plumbing, liquid chemical feed equipment, process piping, booster pump system, and hydromantic pressure tanks. Site work requires water, sanitary sewer, and storm sewer utility pipe construction, erosion control, grading, structural excavation, and paving. Project includes process upgrades to Wellhouse No. 2 including installation of a standby-generator, SCADA, and other upgrades. Project includes SCADA system improvement to multiple sites: Wellhouses 1, 2, & 3, existing water tower, Village Public Works Shop, and other remote sites. The anticipated substantial completion date is June 4, 2025 and final completion date is September 17, 2025. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Andrew Rockweiler, 1230 South Boulevard, Baraboo, WI 53913. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. This project anticipates use of Wisconsin DNR Safe Drinking Water Loan Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. OWNER reserves the right to waive any informalities or to reject any or all bids. Question Deadline 01/15/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Barneveld, WI
Bid Date: Oct 03 2024
Verona, WI
Bid Date: Jan 10 2024
Milwaukee, WI
Bid Date: Nov 20 2023
Milwaukee, WI
Bid Date: Nov 22 2023
Fox Point, WI
Bid Date: Jan 18 2024
La Crosse, WI
Bid Date: Dec 07 2023
Appleton, WI
--
Long Lake, WI
Bid Date: Feb 07 2024
Pewaukee, WI
--
Madison, WI
Bid Date: Jan 09 2024
Jim Falls, WI
Bid Date: Jan 09 2024
Platteville, WI
Bid Date: Jan 30 2024
Evansville, WI
--
Hayward, WI
Bid Date: Jan 09 2024
Madison, WI
Bid Date: Jan 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?