Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 10, 2024

March 11, 2024

March 21, 2026

407 Bruce St

Renovation, Site Work

No Information to Display

$1,200,000.00

Public - City

img_map_placeholder

407 Bruce St, Verona, WI

136

34

28

13

Subscribe to View Full Documents

Replacement of Pumping Station 17 pumping equipment, variable frequency drives, motor control centers, station control center, grinder, piping, and valves. The work also includes valve vault installation, building improvements, site work, HVAC, electrical, instrumentation and controls, and other ancillary work required to completed the improvements. All prime bidders and electrical and mechanical subcontractors must be qualified for this specific work. Before proposals will be accepted for the work contemplated herein, the OWNER will conduct such investigation as is necessary to determine the performance record and ability of the Bidders/subcontractors to perform the size and type of work specified in the Contract Documents. All prospective prime bidders and electrical and mechanical subcontractors must submit qualifications for review and approval by the District. Prequalification applications will be distributed with the Contract Documents or can be obtained from the District. Bidders who have already submitted prequalification documentation to the District within the current calendar year need not resubmit, but must notify the District in writing by the prequalification due date (using the form provided) of their desire to prequalify for this specific work. All questions regarding this project shall be directed to Theran Jacobson, Project Engineer, Madison Metropolitan Sewerage District, phone: 608-709-1843, email: theranj@madsewer.org Question Deadline 01/03/2024 The Project is generally described as follows: The work, officially known as "Pumping Station 17 Firm Capacity Improvements", consists of the replacement of the station's pumping equipment, variable frequency drives, motor control centers, station control center, grinder, piping, and valves. The work also includes valve vault installation, building improvements, site work, HVAC, electrical, instrumentation and controls, and other ancillary work required to completed the improvements

31 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.