Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 26, 2024

April 15, 2024

No Information to Display

To Be Determined

Renovation, Site Work

No Information to Display

$47,194,409.00

Public - County

img_map_placeholder

To Be Determined, Seattle, WA

Subscribe to View Full Documents

Work generally includes installation of a temporary bypass pipe from the pump station to the north end of the project; replacement of the twin 36-inch diameter steel forcemains with 42-inch ductile iron pipe; construction of an odor control facility (OCF) and access road at the forcemain discharge structure (FMDS); and rehabilitation of the twin 48-inch forcemains, the forcemain discharge structure, and the Elliott Bay Interceptor Section 8 (EBI 8) from the forcemain discharge structure to the maintenance hole located near the north side of the golf course.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects