Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 11, 2025

February 8, 2024

No Information to Display

200 W Court St

Renovation

No Information to Display

$350,000.00

Public - County

img_map_placeholder

200 W Court St, Yuma, AZ

26

5

Subscribe to View Full Documents

Before submitting a Proposal, Contractors should carefully examine all provisions set forth herein, visit the site of the work, and fully inform themselves as to all existing field conditions, environment, and limitations. No consideration will be granted for any alleged misunderstanding of the material, practice, articles or piece of equipment to be furnished or work to be done. It is understood that the tender of the Proposal carries with it the agreement to all items and conditions referred to herein or indicated in the Contract Documents. All work MUST be installed/applied in accordance with Authority Having Jurisdiction ("AHJ") and County standards. Should Contractors have any questions regarding this project, they must be submitted to R.E. (Steve) Mendoza, Project Manager via e-mail to Steve.Mendoza@ycso.yumacountyaz.gov. Contractors should reference the project number in the subject of the email. Questions should be submitted by Thursday, December 21, at 12, noon (local time). Questions submitted after this date may not be answered. Before submitting a proposal, Contractors shall carefully examine the bid packet, specifications, and contract documents. Contractors are responsible for understanding field conditions, environment of project, and project site. Yuma County Jail District is not responsible for proposal information based on information received from entities other than the Yuma County Jail District or the Sheriff's Office. The Contractor is responsible for obtaining correct and complete proposal or proposal documents. If appropriate, Contractors shall acknowledge all addenda in their proposal. Failure to acknowledge receipt of Addenda may render the proposal non-responsive and it may be rejected. The successful contractor will be responsible for furnishing all material, rentals, labor, professional services, permits and fees necessary to complete the referenced project: Adult Detention Center Boilers & Pumps Replacement (PM) Work must be performed during business hours 7am-3:30 pm, Monday thru Friday. The selected contractor will perform work as indicated in Sternco Engineers drawings dated 11.9.23. The selected contractor will be responsible for all applicable permit(s) and special inspection(s); if needed or required.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.