Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 30, 2023

January 1, 2024

June 1, 2024

Penfield Ave

Paving, Site Work

No Information to Display

$392,901.00

Public - City

img_map_placeholder

Penfield Ave, Elyria, OH

6

7

2

3

Subscribe to View Full Documents

The Contractor Shall Furnish All Labor, Equipment, Supplies, and Supervision of Labors Necessary to Complete the Work. This Project Includes the Construction of Approximately 1,184 Lineal Feet of New Pvc Storm Sewer (15" & 18"), 4 Precast Concrete Manholes, 890 Linear Feet of 6" Pvc for Laterals, 612 Sy Concrete Pavement (6" & 8") and 161 Cy Asphalt Concrete to Resurface Penfield Ave Between Foster Ave and Lowell St. In the City of Elyria, Ohio BID SECURITY: The bid must be accompanied by a bid guaranty. The bid guaranty must meet all requirements of Section 153.54 of the ORC and the Instructions to Bidders. The contractor will have until June 1, 2024 to substantial complete the project. The City reserves the right to waive any technicalities or informalities, to reject any or all bids received, and to accept any bid with any combination of alternates which is deemed most favorable to the City of Elyria, Ohio at the time and under the conditions stipulated in the project documents. This project includes the construction of approximately 1,184 lineal feet of new PVC storm sewer (15" & 18"), 4 Precast Concrete Manholes, 890 linear feet of 6" PVC for Laterals, 612 SY Concrete Pavement (6" & 8") and 161 CY Asphalt Concrete to resurface Penfield Ave between Foster Ave and Lowell St. PREVAILING WAGES: The contractor and any subcontractor must comply with the prevailing wage rate requirements on public improvements as determined by the Secretary of Labor in accordance with Federal-Aid requirements. Wage rates are set forth in the U.S. Department of Labor wage decision No. OH20210001

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.