Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 23, 2024

March 25, 2024

December 1, 2025

Wharton St

Site Work

No Information to Display

$5,560,116.00

Public - City

img_map_placeholder

Wharton St, Pittsburgh, PA

215

36

20

5

Subscribe to View Full Documents

PWSA is requesting bids for installation of separated storm system to reduce combined sewer overflows from M-15 and M-15Z sewershed. Project includes installation of new storm sewers, surface conveyance, and connection to the existing 54-inch storm sewer on S. 18th St. including water mains, valves, service connections, and hydrants as required or directed. Vendor Questions Due: January 12, 2024 by 4:00 p.m.

36 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.