Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 22, 2023

January 1, 2024

February 29, 2024

10211 Pioneer Blvd

Paving, Site Work

No Information to Display

$129,198.00

Public - City

img_map_placeholder

10211 Pioneer Blvd, Santa Fe Springs, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

***As of January 10, 2024. Project has not been awarded yet. We plan to go to Council this Thursday, Jan 11th, to request approval for the award of contract. Reference Number 0000333752 Additional information regarding this project is available by calling the Public Works Department, Engineering Division, at (562) 409-7540 The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans and Specifications. The general items of work include, but is not limited to, cold milling pavement, asphalt concrete pavement construction, concrete curb reconstruction, signing and striping, slurry sealing, traffic loop detector replacement and other associated work items. The contractor will have twenty-five calendar days to complete the project. The project is anticipated to start construction in January 2024 and be completed by the end of February 2024. The contractor is expected to work on Saturdays and Sundays to meet the project deadline at no additional cost to the CITY. Saturday and Sunday shall be included as part of the calendar working days. No additional working days will be allocated beyond 25 calendar days per these specifications unless approved by the CITY. Question Acceptance Deadline 11/15/2023 at 5:00 PM PT Questions are submitted online Yes -- Submittal of written questions following the meeting is encouraged, and the CITY will determine if a response is warranted. General Requirements - Certified Payroll - Contractors License Required - Insurance Required - License Required - Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 %

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects