Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

January 1, 2024

October 31, 2025

780 N McDonnell Rd

Remodeling, Renovation, Site Work

No Information to Display

$6,000,000.00

Public - City

img_map_placeholder

780 N McDonnell Rd, San Francisco, CA

Subscribe to View Full Documents

The Project work consists of: furnish and install a complete working Methane Gas Detection System in the Airport Central Utility Tunnel. This is an extension of an existing system that will go into the Terminal 1C Basement area. This project will also replace existing tunnel ventilation fans and provide new gas shutoff valves at the Airport's gas main meter assembly. ADD Alternate 1 scope: 1. Provide fans with explosion proof motor. 2. Tie-in and integrate the HVAC system controls to the SFO network for remote access, monitoring and future integration with iconics for data storage and analysis. 3. Provide testing and commissioning for all fans. TRADES REQUESTED: DEMO | HVAC | ELECTRICAL | PLUMBING | MECHANICAL Question Submission Deadline: October 20, 2023, 5:00pm For all questions on the Bid Documents, contact the Contract Administrator: Brian Davidson San Francisco International Airport 650-821-7718 brian.davidson.hil@sfoconsultant.com The purpose of this project is to select a qualified contractor to furnish and install a complete working Methane Gas Detection System in the Airport Utility Tunnel. This is an extension of an existing system that will go into the Terminal 1 Basement area. This project will also replace existing tunnel ventilation fans and provide new gas shutoff valves at the Airport's gas main meter assembly 11.1% MBE; 1.8% WBE; 0% OBE

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.