Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 5, 2023

February 5, 2024

No Information to Display

6501 S 10th St

Asbestos Abatement, Demolition, Outdoor Lighting, Paving, Remodeling, Site Work

No Information to Display

$2,500,000.00

Public - City

img_map_placeholder

6501 S 10th St, Tacoma, WA

Subscribe to View Full Documents

Summary of work: Selective building demolition includes, but is not limited to, gas furnaces, water tank and water heaters, kitchen hood, windows, cement asbestos siding, doors, flooring and concrete floor slab. Building remodel includes a wheelchair lift, resilient flooring, painting, siding, fiberglass storefront windows and doors. Site: work includes new roof drain lines, replacement of damaged asphalt paving, pole lights, trees, new pavement striping, concrete pads and benches. The project site is located within the Tacoma Smelter Plume with sampled arsenic concentrations over 50 ppm. All excavated soils require remediation. Estimated construction cost: $2,500,000. We will review the scope of the work and the documents and provide site specific information applicable to the project. Attendance to this walk-through is strongly suggested. A sign-in sheet will be provided and included in a subsequent addendum. Deadline for questions submitted to the Bonfire Hub is November 20, 2023, 4:00 PM.PST. The Tacoma School District reserves the right to reject any and all bids and to waive any irregularities or informalities. The right is reserved by the Tacoma School District to postpone contract award for the period of thirty (30) days after the bid opening. The Tacoma School District is an Equal Opportunity Employer. No bidder may withdraw the bid after the hour set for the opening thereof, or before award, of contract, unless said award is delayed for a period exceeding thirty (30) days. The Tacoma School District reserves the right to reject any and all bids and to waive any irregularities or informalities. The right is reserved by the Tacoma School District to postpone contract award for the period of thirty (30) days after the bid opening. The Tacoma School District is an Equal Opportunity Employer. No bidder may withdraw the bid after the hour set for the opening thereof, or before award, of contract, unless said award is delayed for a period exceeding thirty (30) days. REMODEL WORK TO INCLUDING REPLACING ALL THE WINDOWS WITH ENERGY EFFICIENT WINDOWS; REPLACING THE WINDOW WALLS TO COMPLY WITH THE ENERGY CODE; REPLACING THE ENTIRE HEATING SYSTEM; INSTALLING A LIFT TO THE STAGE; REMOVING RISERS IN OLD CHOIR AND BAND ROOMS; REMOVING THE EXHAUST HOOD IN THE KITCHEN; REPLACING SOME FLOORING AND CEILINGS; ADDING SOME NEW LIGHTING AND OUTLETS; REMODELING ONE SMALL BATHROOM

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.