Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

November 30, 2023

May 31, 2024

220 Main St

Renovation

No Information to Display

$4,100,000.00

Public - City

img_map_placeholder

220 Main St, Amesbury, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

City of Amesbury Request for Qualifications Designer Services for Amesbury Middle School Roof Replacement Project the City of Amesbury is Soliciting Qualification Packages for Professional Designer Services, Per M.g.l. 7c, 44-57, Relating to the Design of a Complete Roof Replacement of All the Roofs at the Amesbury Middle School Located at 220 Main St., Amesbury, Ma 01913. The Scope Will Include Replacement of the Existing Flat Roof Membrane Systems (Down to Metal Deck) and Pitched Roof Asphalt Shingle Systems (Down to Sheathing), Along With New Gutters and Downspouts. The Project Could Also Potentially Trigger Accessibility Upgrades. The City of Amesbury Reserves the Right to Waive Any Informalities or Irregularities in the Proposals Received, or to Reject Any and All Proposals, Wholly or in Part. Designer RFI Deadline October 30, 2023 Schedule: Notice to Proceed with Design: Anticipated by November 30, 2023 Complete Design and Permitting: by May 1, 2024 City Vote on Additional Funding (If needed): complete by May 31, 2024 Schematic Design Phase: complete by January 12, 2024 Design Development Phase: complete by February 23, 2024 Construction Documents Phase: complete by May 1, 2024 Construction Estimate: $2.9M - $4.1M (doesnt include accessibility upgrades) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.