Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 6, 2024

October 2, 2025

735 Anderson Hill Rd

Renovation

No Information to Display

$17,028,000.00

Public - State/Provincial

img_map_placeholder

735 Anderson Hill Rd, Harrison, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The State University Construction Fund (SUCF) is seeking Statements of Qualifications (SOQs) from consultants to provide design and construction administration services for the Renovate Interior Dining Hall project at the State University of New York College at Purchase The Dining Hall, constructed in 1972, is a 33,000 GSF, three-story building. The Project will renovate the plaza level, 2nd floor level, as well as portions of the lower level outside the dining area and kitchen to provided updated spaces for student services. The Project will provide an interior renovation of approximately 17,000 SF of all three levels of the Dining Hall. Renovations include the replacement of interior finishes, and mechanical, electrical, plumbing, fire protection systems, and AV. The Project includes the removal of hazardous materials and will provide upgrades to meet current code and ADA requirements including two new elevators. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 10/02/2025 The method of Contractor Selection has not been Determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects