Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

January 15, 2024

October 7, 2024

Multiple Locations

Demolition, Paving, Renovation, Site Work

No Information to Display

$9,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Hayward, CA

Subscribe to View Full Documents

Reference Number 0000332907 Site improvements at 28377 Huntwood Avenue, the west end of Tennyson Park for a new 24,500 SF plaza and bioretention area; renovation and remodel of the existing community center at 28200 Ruus Road and conversion to a daycare/preschool; partial demolition of existing structures and related infrastructure and replacement with a new 17,000 SF parking lot and landscape site improvements at 680 West Tennyson Road, in Hayward, CA. The of work includes but is not limited to legal abatement of hazardous materials, removal of site structures, demolition of portions of the existing building, construction of new interior tenant improvements, replacement of existing window systems and new windows and doors as noted, new exterior improvements, and structure, mechanical, electrical plumbing and life safety improvements, and associated site work; and other work required by the project drawings and project manual. Question Deadline 11/01/2023 at 4:00 PM PT Questions are submitted online No Bidders are required to submit any questions in writing, via e-mail, Yama.Farouqi@hayward-ca.gov. General Requirements - Certified Payroll - Contractors License Required - Insurance Required - Prevailing Wage Required The Engineer's estimated cost of construction for the Bid is $9,000,000. The work is to reach Final Completion within two hundred sixty-six (266) calendar days. Each bid must be accompanied by certified or cashier's check, or bidder's bond duly executed by a responsible corporate surety authorized to issue such bonds in the State of California, made payable to the City of Hayward for an amount equal to at least ten (10) percent of the amount bid. The successful bidder shall furnish a and Materials Bond and a Faithful Performance Bond.

38 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.