Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2023

November 1, 2023

January 24, 2024

To Be Determined

Outdoor Lighting, Paving, Site Work

No Information to Display

$384,098.00

Public - City

img_map_placeholder

To Be Determined, Hayward, CA

Subscribe to View Full Documents

Reference Number 0000328810 The works consists, in general, of pavement improvement, reconstruction of curb & gutter, sidewalk, curb ramps, 6'' island curb for landscape planting, LED light fixture replacement, wheel stops and signages, and performing other items or details, not mentioned above, but are required by the Contract Drawings, Standard Specifications, Technical Specifications, or these Special Provisions. Bid Intent Optional Bid Intent Deadline 09/12/2023 2:00 PM PDT Acceptance Deadline 09/04/2023 03:00 PM PDT Questions received less than 5 days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Questions are submitted online No General Requirements - Certified Payroll - Contractors License Required - Insurance Required - Required All questions about the meaning or intent of the Bidding Documents are to be submitted to City's project manager by email (Hector.Leuterio@hayward-ca.gov). Each bid must be accompanied by certified or cashier's check, or bidder's duly executed by a responsible corporate surety authorized to issue such bonds in the State of California, made payable to the City of Hayward for an amount equal to at least ten (10) percent of the amount bid. The successful bidder shall furnish a Labor and Materials Bond and a Faithful . Each shall be for 110% of the bid amount The Engineer's estimated cost of construction is $480,000.00. The anticipated start date of construction is tentatively, November 2023. The work shall be completed within forty-five (45) of working days. At the time this contract is awarded, the Contractor shall possess either a Class A license or a combination of any of the following license classifications which constitute a majority of work: C-10 and C-34.

45 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.