Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

December 14, 2023

May 24, 2024

Multiple Locations

Renovation, Site Work

No Information to Display

$870,000.00

Public - City

img_map_placeholder

Multiple Locations, Cottonwood, MN

Subscribe to View Full Documents

Wastewater Treatment Facility Improvements Est. Completion Date: May 24, 2024 The work includes the construction of approximately: 1. Demolish and dispose of the existing main splitter box. 2. Construct a new main splitter box. 3. Conduct bypass operations. Bypass the existing forcemain over the top of the dike with temporary piping. 4. Remove and replace an existing slide gate. 5. Furnish and install three new slide gates. 6. Remove and replace an existing gearbox. together with numerous related items of work, all in accordance with Plans and Specifications. This project is subject to Prevailing Wage Rates.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.