Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

April 1, 2024

No Information to Display

I-90

New Construction, Paving, Site Work

No Information to Display

$50,000,000.00

Public - State/Provincial

img_map_placeholder

I-90, Austin, MN

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

As of October 17 2023 this project is in working drawings complete. I-90 Austin Bridges Improvement Project INFRA Award: $25,000,000 Austin, Minnesota Applicant: Minnesota Department of Transportation Project Description: The project will reconstruct eight bridges (five overhead structures, two mainline bridges, and one pedestrian bridge) and rehabilitate two mainline bridges along I-90. The project includes ramp connection and traffic signal improvements associated with the bridges, construction of a network of ADA accessible multiuse sidewalks and trails, and replacement of stormwater infrastructure. Project Benefits: Currently I-90 is a barrier between downtown Austin and neighborhoods north of I-90. Extensive equity-focused community outreach and public engagement conducted for this project identified the need for improved bicycle and pedestrian facilities. Additionally, the project is aligned with the state’s climate action and equitable development plans and improves resiliency and disaster preparedness along the corridor. The interchange and traffic signal improvements also address the high number of left turn related crashes and queuing issues, improving safety and reducing congestion. From 2024 to 2026, MnDOT is planning to replace or repair bridges at six sites along the I-90 corridor in Austin. The work will include bridges at: Oakland Avenue West (Hwy 105), replace in 2024 14th Street Northwest (Hwy 218 north), replace in 2026 Fourth Street Northwest, replace in 2024-2025 I-90 over Cedar River, replace in 2024-2025 I-90 over Sixth Street Northeast, rehabilitate in 2024-2025 21st Street Northeast (Hwy 218 south), replace in 2026

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.