Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 27, 2023

November 27, 2023

No Information to Display

16878 AR-309

Renovation

No Information to Display

$82,000.00

Public - State/Provincial

img_map_placeholder

16878 AR-309, Paris, AR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

SPECIFICATIONS A. Prospective Contractor shall replace windows and rotten framing using the following specifications: B. Prospective Contractor shall install new, insulated Anderson windows, model number ADH2450. The wood interior to be clear finished. C. Prospective Contractor shall make sure windows: 1. Windows must have E4 glass. 2. Windows must have a hardware lock & keeper antique brass. 3. Windows must have a colonial grille with 3/4 " aluminum clad. 4. The exterior color must be cocoa bean and exterior rough sawed pine as needed. D. Prospective Contractor shall install single hung 1/1 insulated, clear and argon glass. E. Prospective Contractor shall install new interior jambs and trim along with exterior trim to match existing windows with rough sawn pine. F. Prospective Contractor shall also stain the finish interior. G. Prospective Contractor shall prime and paint exterior to match existing windows trim with the same type of materials. H. Prospective Contractor shall construct any and all construction safety barriers to keep bystanders out of work areas and at a safe distance for the duration of the project. I. Prospective Contractor shall furnish all tools, materials, equipment and labor necessary to complete the project. J. Prospective Contractor shall complete work within sixty (60) days from time of bid being awarded. K. Prospective Contractor shall prevent any unnecessary damage to any part of the building. L. Prospective Contractor shall be responsible for any and all post-project clean-up. M. Prospective Contractor shall remove all debris (including nails and metals, all disposable materials offsite) at the end of each workday. N. Prospective Contractor shall work during normal business hours of 8:00 a.m. until 5:00 p.m., Monday through Friday, excluding State holidays. O. Prospective Contractor shall schedule all work with park officials. P. Prospective Contractor shall provide all necessary taxes and freight. Q. Prospective Contractor shall provide one (1) year warranty that applies to all work performed. R. Prospective Contractor shall furnish Worker's Compensation and General Liability Insurances. S. Prospective Contractor shall be responsible for all materials and deliveries as well as protection of during construction. T. Prospective Contractor shall be responsible for protection of the building from elements during all periods of construction. U. Prospective Contractor shall furnish all tools, equipment, and labor to take out/remove all exterior windows and dispose of from job site.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.