Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

January 8, 2024

May 7, 2024

146 Box Cut Rd

Paving, Site Work

No Information to Display

$670,000.00

Public - State/Provincial

img_map_placeholder

146 Box Cut Rd, Alligator Point, FL

Subscribe to View Full Documents

The Florida Department of Environmental Protection, Bureau of Design and Construction is soliciting formal, competitive Question Deadline 10/30/2023 Scope of Work 1. Work consists of coordinating, scheduling, obtaining and assembling at construction site all equipment, materials, permits, supplies, manpower and other essentials and incidentals necessary to perform Work as required and defined in this Project. The Work of this Contract will be performed at the structures shown on Drawings. B. Contractor shall furnish all material, labor, tools, supplies, permits, equipment, transportation, superintendence, barricades, temporary protection, bracing, shoring, temporary construction of every nature, insurance, taxes, contributions and all services and facilities, unless specifically excepted, and install all materials, items, and equipment required to complete the construction of the Project, as set forth in the Contract Documents. C. Refer to Section "Work Items" for a description of work. Work Item specifications, details, and drawings shall govern all repair operations. Locations where Work Items apply are shown on Drawings as symbols. 1.3 MEASUREMENTS: A. Before ordering any material or doing any Work, Contractor shall verify all measurements at the Project Site and shall be responsible for correctness of same. B. Before proceeding with each Work Item, Contractor shall locate, mark, and measure quantity of each item and report quantities to Engineer for each location. 1.4 WORK SEQUENCE: A. Prior to commencement of Work, meet with Engineer and Owner representatives to establish sequence and schedule of Work. Contractor shall give Owner notice of areas to be cleared at least 7 working days in advance of actual Work. B. Contractor shall notify Owner's representative at least 24 hours prior to commencing any abrasive blasting such as sandblasting, etc. operations. C. Work will be conducted in phases to provide least possible interference to activities of Owner's personnel and facility users. 1. Contractor's work hours shall be limited to comply with noise ordinances. Contractor is allowed to work as necessary to complete work within Owner's time schedule and conditions conducive to temperature sensitive materials. D. Contractor shall remove debris from Work Area on daily basis and dispose of same at authorized sites. E. Contractor shall remove dust and air transported material from remainder of facility at conclusion of operations in Work area

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.