Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

November 16, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$520,000.00

Public - City

img_map_placeholder

Multiple Locations, Basehor, KS

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of Basehor is requesting a lump sum proposal from individuals interested in the removal and replacement of 4,407 Lf. of concrete curb panels along the following sections of roadway. Pin Oaks Subdivision 1,125 Lf. Lazy-Back Curb Exhibit 1a and 1b. Creek Ridge Subdivision 712 Lf. Lazy-Back Curb Exhibit 2a and 2b. 155th St. South of State Ave. Round-a-bout 405 Lf. Lazy-Back Curb Exhibit 3a and 3b 155th St. South of State Ave. 2,165 Lf. High-Back Curb Exhibit 3a and 3c General Information 1. These curbs are located in the ROW of property owned by the City of Basehor. 2. The curb panels have been inspected by city staff and painted with a white paint showing sections to be removed and replaced. 3. A location reference sheet along with the corresponding map detailing our locations is provided with this RFP as Exhibits. 4. Concrete for curb panel replacement must meet City of Basehor Technical Specification Public Improvements section 2004 Concrete Mix Table 2005-1 stating mix KCMMB 4K AE. Steel will be required for the curb panels. 5. Curb panels to be removed may be disposed of at 2300 N. 158th St. Basehor, KS 66007. 6. Backfilling of curbs will be completed by City of Basehor. Firms will be required to obtain and maintain a valid City Business License. A Professional Service Agreement (PSA) will be executed between the city and selected contractor prior to project proceeding. A Project Tax Exempt Certificate (PEC) will be provided to the selected contractor. For questions, information contact Gene Myracle at (913) 724-2000 or citysuper@cityofbasehor.org. Interested parties are advised that all equipment, labor, and materials needed to perform the removal & replacement of the curb panels is the sole responsibility of the successful respondent. The City reserves the right to reject any, all, or part of proposals received and to waive any informalities. Pin Oak Curb Replacement Locations 1. 15411 Poplar St. 55 Lf. 2. 15401 Poplar St. 20 Lf. 3. 15420 Poplar St. 80 Lf. 4. Curb Box East Side 154th & Poplar St. 10 Lf. 5. 3401 N.154thSt. 20 Lf. 6. 3407 N. 154thSt. 90 Lf. 7. 3425 N. 154thSt. 35 Lf. 8. 3432 N. 154thSt. 20 Lf. 9. 3432 N. 154thSt. 45 Lf. 10.3420 N. 154thSt. 20 Lf.11.3412 N. 154thSt. 20 Lf. 12.3406 N. 154thSt. 20 Lf. 13.Poplar St. & 154thSt. North side going West 175 Lf. 14.15424 Poplar St. 10 Lf. 15.3309 154th Terr. 20 Lf. 16.15420 Pin Oak St. 10 Lf. 17.15420 Pin Oak St. 190 Lf. 18.15439 Pin Oak St. 90 Lf. 19.15425 Pin Oak St. 45 Lf. 20.154th Terr. West Side of Roadway 120 Lf. 21.154th Terr. East side of Roadway 30 Lf. Total Lf. Pin Oak Subdivision Curb Replacement 1,125 Lf. Creek Ridge Curb Replacement Locations 1. 15601 Cedar St. 10 Lf. 2. 1816 N. 156th St. 22 Lf. 3. 1811 N. 156 th St. 10 Lf. 4. 1813 N. 156 th St. 10 Lf. 5. 1819 N. 156 th St. 20 Lf. 6. 1823 N. 156 th St. 20 Lf. 7. 1825 N. 156 th St. 10 Lf. 8. 15610 Landauer St. 10 Lf. 9. Landauer St. South Side 20 Lf. 10.1821 N. 157 th St. 10 Lf. 11.1913 N. 157 th St. 50 Lf. 12.1916 N. 157 th St. 20 Lf. 13.1914 N. 156 th St. 30 Lf. 14.1900 N. 157 th St. 275 Lf. 15.1820 N. 157 th St. 15 Lf. 16.15629 Cedar St. 35 Lf. 17.15627 Cedar St. 55 Lf. 18.15624 Cedar St. 50 Lf. 19.15628 Cedar St. 20 Lf. 20.North Side of Cedar St. 20 Lf. Total Lf. Creek Ridge Curb Replacement 712 Lf 155 th St. South of State Ave Curb Replacement Locations 1. North Island from Round-a-bout 195 Lf. 2. West Island from Round-a-bout 35 Lf. 3. South Island from Round-a-bout 65 Lf. 4. South Island from Round-a-bout 35 Lf. 5. North-East curb from Round-a-bout 75 Lf. 6. 155 th St. West Side Roadway 387 Lf. 7. 155 th St. West Side Roadway 505 Lf. 8. 155 th St. West Side Roadway 90 LF. 9. 155 th St. West Side Roadway 254 Lf. 10.155 th St. West Side Roadway 20 Lf. 11.155 St. West Side Roadway 175 Lf. 12.155th St. West Side Roadway 105 Lf. 13.155th St. West Side Roadway 135 Lf 14.155 th St. East Side Roadway 96 Lf. 15.155 th St. East Side Roadway 42 Lf. 16.155 th St. East Side Roadway 40 Lf. 17.155 th St. East Side Roadway 66 Lf. 18.155 th St. East Side Roadway 30 Lf. 19.155 th St. East Side Roadway 20 Lf. 20.155th St. East Side Roadway 30 Lf. 21.155 th St. East Side Roadway (Storm Box) 30 Lf. 22.15415 Pinehurst Dr. 140 Lf. Total Lf. 155th St. Round-a-Bout & Roadway South 2,570 Lf.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.