Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

December 1, 2023

No Information to Display

705 30th St

Addition, Remodeling, Renovation, Site Work

No Information to Display

$685,000.00

Public - County

img_map_placeholder

705 30th St, Hoquiam, WA

Subscribe to View Full Documents

If you download plans, please let us know so we can add you to the Planholders List. This allows you to receive updates and Addenda in a timely manner. Email Carrie to be added to the list. Interior remodel of wood frame structure including addition of restroom facility. WORK INCLUDED Provide all labor, materials and equipment required to complete all the Work under a single, lump sum contract for Maintenance Building Remodel, located at 705 30th Street, Hoquiam, Washington, as shown on the Drawings and described in the Project Manual. Items of the Work include, but are not limited to: 1. Relocate Dispatch area to former Meeting Room. 2. Expand driver's lounge into former Dispatch area. 3. Convert existing Work Room to restroom facility with (2) standard private toilet stalls, (1) accessible private toilet stall, and common lavatory area. 4. Create File Room on upper floor. 5. Remove and relocate existing tackboards and whiteboards and reinstall as directed by Owner. 6. Asbestos abatement. WORK NOT INCLUDED The following items of work will be performed by others, under separate contract, and are not included in this Contract. The Contractor is responsible for storing, if requested, separate contract equipment. The Contractor is responsible for coordinating related work of the Contract with separate contract work. The Contractor shall provide all preparatory work necessary for proper installation of separate contract items including: blocking and backing, and shall provide all finish work necessary for proper installation of separate contract items including: caulking, grouting, furring and painting adjacent surfaces. 1. Privacy screen in Hall-121. 2. Radio equipment and associated 3. Voice/data cabling and all terminations. 4. Moving furniture and equipment, unless shown otherwise. 5. All other items shown on the Drawings and/or described in the Project Manual as "NIC" (not in contract). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Direct all questions in writing to Alan Gozart AIA at the office of the Architect, email alan@harborarchitects.com. 3. Submit questions no later than Tuesday October 24th by 12:00 pm. Clarifications will be included in Addenda. 4. Verbal answers and clarifications are not binding on any party. Question Deadline 10/24/2023 at 12:00 PM PT Direct all questions in writing to Alan Gozart AIA at the office of the Architect, email alan@harborarchitects.com. . Clarifications will be included in Addenda. 4. Verbal answers and clarifications are not binding on any party

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.