Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

November 16, 2023

No Information to Display

298 Mehrhof Rd

Renovation

No Information to Display

$300,000.00

Public - County

img_map_placeholder

298 Mehrhof Rd, Little Ferry, NJ

Subscribe to View Full Documents

In general, the project consists of removing the existing breeching for the two boilers located in the boiler room of Pump Building No. 1 and furnishing and installing new breeching, supports and all accessories necessary for operation at the Bergen County Utilities Authority (BCUA) Wastewater Plant in Little Ferry, New Jersey as specified herein. Questions Due Date Online Portal The Q and A Period for this Opportunity is Ongoing Never N/A B. The breeching to be installed under this Contract shall meet the performance standards as outlined in the bid documents. Contractor is responsible for all labor, materials, and equipment included in disconnecting and removing the existing units. C. It is the intent of these Specifications and Contract Drawings for the Contractor to furnish and install the new breeching completely, which includes all the necessary improvements as set forth in the Contract Documents. The Scope of Work below outlines the general items and distribution of work and shall not be construed as being all inclusive. The work of this project consists of the following: A. Furnish and install two (2) boiler breechings, including removal of existing breeching, permitting, furnish new materials including supports and installation of new breeching including all cleanup and restoration. B. Contractor shall be responsible for all post installation testing to document and certify compliance with the performance specifications. Refer to the Contract Drawings for details pertaining to the demolition of the existing breeching and the new breeching layout, dimensions, and materials. 2.02 Material Storage Area: A material storage area for the Contractor's use shall be coordinated with the Owner. Contractor is responsible for securing his work area and stored equipment. Contractor shall coordinate with all other work that may be under construction at the plant. All material shall be stored in methods to maintain the integrity of the existing materials. 2.03 The above Scope of Work outlines the general items and distribution of work and shall not be construed as being all inclusive. 2.04 The Contractor shall obtain permission of the Owner prior to removing any equipment from service for performance of the work required under this Contract.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects