Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

January 1, 2024

July 2, 2025

Avila Beach Dr & Shell Beach Rd

Paving, Site Work

No Information to Display

$11,959,287.00

Public - County

img_map_placeholder

Avila Beach Dr & Shell Beach Rd, Avila Beach, CA

Subscribe to View Full Documents

This project will improve the operations and multi-modal access of Avila Beach Drive at the northbound and southbound intersections. The project will consist of three main components: 1) A roundabout at the southbound ramp intersection; 2) Modifications to the northbound off-ramp; and 3) A Park & Ride lot and Regional Transit Authority (RTA) bus stop at the southwest corner of Avila Beach Drive and Shell Beach Road. Question Deadline 10/13/2023 at 3:00 PM PT. Requests for Information must be submitted Engineers Estimate: $11,959,287.00 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all. All work mentioned or indicated in the Contract Documents, and all work reasonably inferable from them, shall be performed by the Contractor as part of the Contract unless it is specifically indicated in the Contract Documents that such work is to be done by others. Nothing in the specifications voids the Contractors public safety responsibilities. In the event of conflict between any of the Contract Documents, the provision placing a more stringent requirement on the Contractor shall prevail. The Contractor shall provide the better quality or greater quantity of work and/or materials unless otherwise directed by the County in writing. In the event none of the Contract Documents place a more stringent requirement or greater burden on the Contractor, the controlling provision shall be that which is found in the document with higher precedence (see section 5-1.02). Unless a more stringent requirement is provided in the Contract Documents, the Contractor shall provide for work completion using the best general practices. Nothing herein shall relieve the Contractor of its obligation to notify the County of any inconsistencies in the documents.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects