Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

December 25, 2023

April 18, 2025

595 Christian Valley Rd

Site Work

No Information to Display

$1,750,000.00

Public - County

img_map_placeholder

595 Christian Valley Rd, Auburn, CA

Subscribe to View Full Documents

A Bid Guaranty in an amount not less than ten percent (10%) of the total aggregate of the bid, including all Additive and/or Alternate Bid Items shall accompany each bid. This Bid Guaranty is to be forfeited should the Bidder, if awarded the contract, fail to enter into the same, or fails to furnish the bonds and/or proof of insurance as stipulated in the Contract Documents. The checks or bond shall be made payable to the Owner. The successful Bidder will be required to furnish both a Faithful Performance Bond in the amount of one hundred percent (100%) and a Payment Bond in the amount of one hundred percent (100%) of the Contract price Question Deadline 10/18/2023 at 4:00 PM PT Written questions regarding the Contract Documents and/or the proposed Work should be directed to Jordan Jakobsen, Associate Engineer by phone at 530-823-4950, or e-mail The estimated cost of construction is $1,750,000. Project Description: In accordance with plans and specifications prepared by Water Works Engineers, LLC, the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of water treatment plant improvements, including but not limited to the following: Remove and dispose of existing 27" raw water piping and existing 30" slide gate. Demolition and disposal of existing flocculation basin infrastructure including existing paddle flocculators, rapid mixer, concrete supports, handrail and grating. Demolition and disposal of existing influent 18" piping, butterfly valve, and flowmeter. Supply and install new influent 18" piping, flowmeter, butterfly valve, and chemical injection piping. Supply and install new 30" raw water piping and associated chemical injection piping and vault. Supply and install of new 30" slide gate. Supply and install (6) vertical turbine flocculators with motor center addition and (1) rapid mixer. Supply and install miscellaneous metals including beams, grating, handrail, and davit bases. Construction of intake screen channel, supply and installation of automatic fine screen with controls. The total Contract Time to achieve Final Completion is 480 calendar days

38 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.