Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

No Information to Display

NL-1

Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

NL-1, Channel-Port aux Basques, NL

Subscribe to View Full Documents

Closing Time: 2:30 PM (NT) Question Acceptance Deadline 2023/10/05 02:00:00 PM ADT The project is located at the Marine Atlantic Ferry Terminal at Port aux Basques, Newfoundland and Labrador. The primary work area is within the Fuel Terminal Tank Farm located in a separate secure area north of the main ferry terminal facility. The work includes, but is not limited to, the following: Mobilization and demobilization, including all labor and equipment as specified and as required to carry out the work. Removal and disposal of the exterior insulation and cladding from the shell and roof assemblies. Removal and disposal of studs and hardware supporting the insulation and cladding. Studs are to be ground flush with the tank shell using coldwork. Overgrinding is to be prevented, Contractor to take care not to overgrind, as such will result in repairs being required to re-establish nominal steel thickness. Such repairs resulting from Contractor performance will not be considered for compensation under this Contract. Complete and API Standard 653 inspection and non-destructive examination (NDE) of the shell and roof plates. Inspections are to be carried out by a certified inspector. Provide a report indicating the results of these inspections. Submittals: Preparation, submission, and implementation of an approved Construction Schedule. Preparation, submission, and implementation of an approved Site-Specific Safety Plan. Preparation, submission and implementation of an approved Traffic Control and Pedestrian Plan. Preparation, submission, and implementation of an approved Site-Specific Environmental Protection Plan. Preparation, submission, and implementation of an approved Project Execution Methodology. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects