Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

February 15, 2024

To Be Determined

Renovation

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

To Be Determined, Argentia, NL

Subscribe to View Full Documents

Closing Time: 2:30 PM (NT) ** Please note that there has been 1 addendum issued for this project. ** Question Acceptance Deadline 2023/10/05 02:30:00 PM NDT The Work generally includes, but it is not necessarily limited to, the repairs for the Ramp and Transfer Bridge. More particularly the work includes, but is not necessarily limited to, the following: Mobilization and demobilization, including all labor and equipment as specified and as required to carry out the work. Pre-Inspection Survey of all components of the work and report to Owner's Representative any and all discrepancies prior to commencing repairs. Clean, sandblast and paint full structural steel members FB2, GA, GB, GC and Lift Beam on Transfer Bridge as indicated on drawings (S01). Replace 200 (total) corroded bolts, nuts and washers with galvanized grade A325M as indicated on drawings (S02). Diameter and length to match existing. Bolt locations to be determined by Owner or Owner's Representative on site. Repair spalling, cracking, and honeycombing for all concrete abutment walls and diaphragms for the underside of Approach Bridge; as shown on drawings (S03). Repair deck slab spalling at underside of deck as shown in Photo #4 on drawings (S03). Fill 30 (total) open holes using non-shrink grout along abutment walls and diaphragm for the underside of Approach Bridge; as shown on drawings (S03). Provide post repair photographic evidence of all components of the work and submit to Owner's Representative upon completion. Submittals: Preparation, submission, and implementation of an approved Construction Schedule. Preparation, submission, and implementation of an approved Site-Specific Safety Plan. Preparation, submission, and implementation of an approved Site-Specific Environmental Protection Plan. Preparation, and submission of a Project Execution Methodology. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects