Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

November 23, 2023

May 24, 2024

120 Beach St

Renovation

No Information to Display

$962,924.00

Public - City

img_map_placeholder

120 Beach St, Santa Cruz, CA

Subscribe to View Full Documents

he Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: The Main Beach Public Restroom Renovation Project involves a partial rebuild/renovation of an approximately 800 square foot, existing public restroom at 120 Beach Street. The interior space will include men's and women's restrooms, a chaseway, and a storage room. The existing building will be demolished down to the studs and roof structure. Some framing studs will need to be replaced due to dry rot. A new six-inch concrete curb will be added at existing walls and new walls. The Project will include installing new interior and exterior finishes; privacy screens at restroom entrances; plumbing fixtures, including, but not limited to, toilets, partitions, shower heads, hand dryers, waste bins, urinals, a water fountain, and hose bibs; a new standing seam metal roof and dome skylights; electrical outlets, and tile wall murals on the south, east, and north exterior sides of the building (the "Work"). The Project is being funded through the CALTRANS Clean California Local Grant Program. All construction work must be completed prior to May 24, 2024. Questions and Clarification Submission Deadline: October 3, 2023, 5:00pm Question and Clarification Response Tentative Deadline: October 11, 2023, 5:00pm

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.