Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 21, 2023

January 22, 2024

July 20, 2026

Murray St

Paving, Site Work

No Information to Display

$4,100,000.00

Public - City

img_map_placeholder

Murray St, Santa Cruz, CA

Subscribe to View Full Documents

This project will install new piles, extend the existing pile caps to incorporate the new piles, construct a new line of columns, place new bent caps, widen the bridge deck, and construct new see-through barrier rails. The resulting project, in addition to the structural upgrades, will result in a bridge deck with wide 6-foot bike lanes and a 7.5-foot sidewalk along the south (ocean) side to support a two-way pedestrian path of travel. The elevated curbs adjacent to the bike lanes will be replaced with standard 6-inch-high curbs to improve the bicycle user experience. The solid concrete vehicular barrier will be replaced with rails, allowing for better harbor and ocean views. State and federal funding allows for improvements within 200 feet of the bridge abutments. Therefore, the project includes widening the bike lanes and sidewalks to improve the transitions and storm drain system on the west side of the bridge. Question Submission Deadline: November 14, 2023, 2:00pm The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: Seismically retrofitting the structure, replacing non-standard bridge barriers with new barriers and required shoulders, roadway approach work to accommodate the new bridge configuration, constructing retaining walls, bioretention facilities, storm drains, sewer force main, waterline and other appurtenances The Project is to be performed at the following location: Murray Street Bridge over the Small Craft Harbor.

61 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.