Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2023

October 20, 2023

October 31, 2023

To Be Determined

Renovation

No Information to Display

$107,770.00

Public - County

img_map_placeholder

To Be Determined, West Deptford, NJ

Subscribe to View Full Documents

Remove and replace all edge coping around the perimeter ofthe roofwith new aluminum edge coping with Kynar finish as specified in the project documents. Inspect the condition ofthe existing wood blocking around the perimeter ofthe roof in coordination with the engineer. Remove and replace all deteriorated areas identified by the engineer prior to installation ofthe new roofing system if and where directed. Remove and replace existing roof drains with new roof drains including metal bowl and collar to match existing roofslope and conditions. Pre-manufactured drain sleeves will be considered in lieu ofreplacement, upon inspection. Provide all new flashing materials in accordance with manufacturer requirements for the designed roofing system. This includes all roof penetrations, edges, curbs, vent pipes, smoke vents, exhaust fans, roof drains, walls, etc. Furnish and install mechanical terminations in accordance with manufacturer requirements for the designed roofing system. The attached workshop section (higher roof) is not part ofthe project cost (see attached drawing). Remove and properly dispose ofthe existing roofing system complete down to the existing metal with light concrete roof deck. This includes complete removal of all roofing membranes, insulation and all flashing materials. Inspect the condition ofthe existing roof deck in coordination with the engineer. Repair all deteriorated areas identified by the engineer prior to installation ofthe new roofing system if and where directed.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects