Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 18, 2023

October 2, 2023

November 3, 2023

Multiple Locations

Paving, Site Work

No Information to Display

$301,360.00

Public - City

img_map_placeholder

Multiple Locations, Stevens Point, WI

Subscribe to View Full Documents

Approximately 350 tons of 3MT58-28S HMA pavement; approximately 680 tons of 4MT58-34S HMA pavement; approximately 70 tons of asphaltic surface; prepare foundation for asphaltic paving (project); traffic control; and all incidental items required to complete the work 2023 Fall Paving Project Site Directions: Locations Vary Est. Completion Date: Nov. 3, 2023 The contract shall consist of preparing roadway for asphaltic surface, placing new asphaltic binder and surface, finishing roadway and all incidental items thereto at the locations identified in the plans and these special provisions and as identified by the engineer or their duly authorized representative. The City shall be responsible for providing overall traffic control from the time contract work is commenced until the roadway can be opened to traffic, but the contractor will be responsible for providing flaggers for paving operations; general cleanup including sweeping of the binder and removal of excess concrete is also required and shall be incidental to bid items included in the contract documents. Approximately 350 tons of 3MT58-28S HMA pavement; approximately 680 tons of 4MT58-34S HMA pavement; approximately 70 tons of asphaltic surface; prepare foundation for asphaltic paving (project); traffic control; and all incidental items required to complete the work.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects