Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 25, 2024

No Information to Display

2100 Main St

New Construction, Paving, Site Work

No Information to Display

$35,431,000.00

Public - State/Provincial

img_map_placeholder

2100 Main St, Stevens Point, WI

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

As of October 27, 2023, a bid set for this project is expected to be issued early December 2023 with bids due end of January 2024. Construction could follow in late first quarter or second quarter 2024. The below solicitation is for historical purposes: This project will construct 133,100 GSF of shared activity space for student health and wellness programs to address inadequacies and deficiencies in existing facilities. A significant portion of the space will include a four-court gymnasium with an indoor jogging track; fitness spaces including cardio, strength, and group fitness; locker rooms and offices for staff; and support space for Outdoor Edventures trips and clinics. The center will also include space for the Student Health Service (SHS), the Counseling Center, and the University Child Learning and Care Center (UCLCC). The new building's design will encourage student interaction and reflect the university's Healthy Communities Initiative. The building will be constructed on the current northeast quadrant soccer field, and new outdoor fields for soccer, track, rugby, softball, and football practice will be added. The soccer, rugby, and football practice fields will be artificial turf, while the others will be natural grass. The central campus utilities capacities are sufficient to provide heating and cooling to the new facility, however, underground utility extensions to the new facility will be required. Note: The Department of Administration has implemented new security procedures for the building located at 101 East Wilson Street, Madison, WI. Please allow time to move through security on the first floor before delivering your submittal to the 7th Floor Reception Desk.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects