Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

October 9, 2023

May 31, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$690,000.00

Public - City

img_map_placeholder

Multiple Locations, Goodrich, MI

Subscribe to View Full Documents

HMA cold milling, full depth HMA removal and replacement, concrete curb and gutter removal and replacement, drainage structure reconstruction, and HMA resurfacing to be completed in 2023. The project length is approximately 3,264 feet. Documents downloaded from our website will bear a watermark on the Proposal and Legal Status of Bidder pages and will be considered unofficial copies for bidding purposes. The Bidder is responsible for obtaining official Procurement Documents from Wade Trim; copies obtained from anywhere other than Wade Trim will be considered unofficial copies and will not be considered a responsible bid. The Village of Goodrich reserves the right to accept any, or reject any and all bids, and to waive any informality in any bids should it consider same to be in its best interest. Should any prospective BIDDER find discrepancies in, or omissions from the Plans, Specifications or other parts of the Contract Documents, he may submit a written request to the ENGINEER for an interpretation thereof. The person submitting the request will be held responsible for its prompt delivery at least seven (7) days prior to the date for opening of Bids. Questions received less than seven (7) days prior to the date for opening of bids will not be answered. Any interpretation of inquiry will be made by Addendum duly issued to all prospective BIDDERs. A bid bond is not required for this project The Contractor shall have until MAY 31, 2024, to meet the specifications associated with Turf Establishment, Performance.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.