Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

December 25, 2023

400 N Escondido Blvd

Renovation

No Information to Display

$240,594.00

Public - City

img_map_placeholder

400 N Escondido Blvd, Escondido, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Reference Number 0000329116 Bid Intent Not Available Question Acceptance Deadline 10/04/2023 05:00 PM PDT Questions are submitted online No Questions concerning this project may be directed to: Dominic Furio at 760-802-0395, dfurio@escondido.org, and Laura McLin at 760-271-3780, lmclin@escondido.org. The Work under this contract includes the furnishing of labor, tools, new materials and current generation equipment to install a complete new chiller replacement in the City of Escondido, California Center for the Arts Central Plant building and testing and commissioning. The Contractor is responsible for proper disposal of all the old equipment. A basic set of plans are being provided in order for the Contractor to know the of work. The Prime Contractor on this project shall have a "Class B and Class C-20" contractor's license from the State of California. The Prime Contractor on this project must do 51% of all the work. The Work under this contract includes the furnishing of labor, materials, tools and equipment, which is required for the completion of the project in accordance with the provisions of the Contract Documents. Engineer's estimate is $250,000. The CONTRACTOR will be required to furnish with the contract a Faithful Performance Bond in the amount of one hundred percent (100%) of the aggregate amount of the bid and a Labor and Material Bond in the amount of one hundred percent (100%). The CONTRACTOR will also furnish certificates of insurance evidencing all insurance coverage required by the Specifications has been secured. The Contractor shall possess a valid State of California Contractor's License issued by the State Contractor's License Board. The license shall be current and valid at the time the contract is awarded to the Contractor and remain in effect throughout the duration of the project. Notice to Proceed, and shall complete all the Work and improvements within thirty (30) working days from delivery of equipment.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects