Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2023

October 9, 2023

No Information to Display

100 N 6th St

New Construction, Site Work

No Information to Display

$49,993.00

Public - City

img_map_placeholder

100 N 6th St, Philipsburg, PA

Subscribe to View Full Documents

Question Deadline 09/13/2023 at 5:00 PM ET All Requests for Information should be written and submitted via web site within the "Clarifications" feature no later than Wednesday Central Intermediate Unit 10 hereby invites the electronic submission of sealed bids for the CIU 10 - 100 North 6th Street Project The Central Intermediate Unit 10 is seeking proposals for the demolition of interior finishes and equipment at 100 North 6 th Street, Philipsburg, PA as noted in drawings and specifications prepared by Hoffman Leakey Architects. The undersigned reserves the right to waive informalities or defects in a bid to the extent permitted under Pennsylvania Law and to reject any or all bids or parts thereof. Demolition and removal of wood flooring, wall pads, bleachers, HVAC equipment, ductwork, fixtures basketball goals, etc. The building is currently not connected to utility services, and it will be the contractor's responsibility to provide temporary electrical/lighting as needed to complete the work. This project is publicly funded and is subject to PA state prevailing wage rates. Scope of work o Remove hardwood gym floor and sleepers to concrete slab. Salvage 500 SF of flooring for owner use. o Remove and dispose of folding partition. o Remove and dispose of existing HVAC system: HVAC units, ductwork, radiators, piping, etc. Repair roof as needed to maintain water tight condition. o Remove and dispose of basketball goals, backboards, and rigging. o Remove and dispose of bleachers and associated hardware. o Remove and dispose of wall padding. o Remove and salvage scoreboards. Protect and turn scoreboards over to owner. o Remove and dispose of all existing exposed utility piping, electrical conduit and light fixtures. o Remove and salvage existing PA speakers and turn over to owner. o Adhere to ALL OSHA safety standards. o "Broom Clean" all surfaces and remove all residual debris at completion of project

45 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects