Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 25, 2023

October 2, 2023

June 18, 2025

901 Facilities Ave

New Construction, Site Work

No Information to Display

$1,200,000.00

Public - State/Provincial

img_map_placeholder

901 Facilities Ave, Rolla, MO

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Construction is slated to start October 2023 and be substantially complete by June 18, 2025. The project overall consists of a new, ground up two-story steel structure consisting of approx. 118,055 GSF. The Protoplex is comprised of a 30 ft clear height high-bay area and an adjoining two-story office and lab building. The high bay area contains partitioned research spaces for ceramics, metallurgy, and general-purpose manufacturing. The office and lab building contains research office suites, testing labs, conference rooms, a 26' tall meeting room, and a loading dock. For vertical circulation, there are two sets of stairs and an elevator. A large mechanical penthouse and cooling tower are located at the building's roof. Geothermal plan has been added scope from the previous budget effort. The total building area will be roughly 118,055 gross square feet, with 77,512 square feet finished out within the base budget, representing the Priority 1 program. If additional funding for equipment becomes available during construction, the remaining 40,543 square feet of Priority 2 can be fit out as well. The building exterior facade is anticipated to be metal composite materials panels on the high bay volume with curtainwall providing daylight into the high bay from the south, and metal panel with storefront/curtainwall on the northern office volume. Associated site work includes grading to accommodate the new footprint, retaining walls, access drives, approximately 80 parking spaces and the possibility for demolition of four existing structures. The civil work includes minimal demolition work and some tree removal, earthwork moving, utility and sewer installations, and paving for roadways, drives, parking lots, curbing, and sidewalks. The major demolition activities needed to clear the site for this new building are being handled by another project for S&T. The project consists of well drilling of 204 geothermal wells, piping, header work and stub up in to the main building, with minor site prep work including SWPPP plan. Bids are being requested for the following: Mechanical

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.