Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 21, 2023

November 20, 2023

February 18, 2024

To Be Determined

New Construction, Site Work

No Information to Display

$372,647.00

Public - City

img_map_placeholder

To Be Determined, Princeton, IL

Subscribe to View Full Documents

The owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the owner that such bidder is properly qualified to carry out the obligations of the agreement and to complete the work contemplated therein. The owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the owner that such bidder is properly qualified to carry out the obligations of the agreement and to complete the work contemplated therein. The contractor shall provide an insurance document stating that the contractor has a minimum of $1,000,000 liability coverage A. The contractor shall furnish and install a complete 70' x 100' post frame or steel frame building. B. Building will have a complete foundation per building manufacturers requirements. C. The contractor shall base his bid price on the equipment specified. Substitute equipment will be considered for one reason only: that the equipment proposed for substitution is superior or equal in construction and efficiency to that described in the specifications. D. If, prior to the execution of the contract, the city's approval is obtained for alternate equipment, the contractor shall, at his own expense, make any changes in the structures, building necessary to accommodate the equipment and if engineering is required due to substitution of other material, the contractor shall pay the engineer for the engineering services (all of which will be subject to the city's approval). 2.00 CONSTRUCTION A. The Pre-Engineered building must come from a company with a minimum 5 yrs documented experience. B. The building shall have 19' sidewall and minimum 4/12 roof pitch with 12" overhang C. The building shall meet or exceed local building codes D. All electric and plumbing work will be done by others. E. Concrete floors will be installed at a later date F. Building will have in floor heat installed at a later date. G. Interior side wall lining will be installed at a later date. H. Interior partition wall will be installed at a later date. I. Exterior siding, roof and trim colors to be determined based on successful bidders color options. J. Site work and foundation excavation will be provided by the City of Princeton. 2.30 BUILDING SPECIFICATION: A. Foundation shall be minimum 48" below grade B. Posts will be laminated and pressure treated lumber C. Metal siding shall be minimum 26 gauge and all panels will be one piece. D. Steel panels will have minimum 40 year warranty E. Roof can be either seamless / hidden fastener metal or sheeting, synthetic underlayment, and exposed screw metal. F. Fascia will be 2" x 6" G. Roof will have snow/ice retention H. Building will have gutter and down spouts I. Building will have house wrap installed on outside walls J. Walls will have minimum R19 spray foam or spray foam fiberglass combination. K. Ceiling will have minimum R38 insulation L. Provide and install 2 - 24' x 16' insulated overhead door per drawing. M. Provide and install 6 - 48" wide by 48" high sliding window per drawing. N. Provide and install 2 - 36' wide by 80" high commercial grade walk door per drawing O. Frame and install provided exhaust fan as shown on drawing. P. Install top plate in ceiling for future interior partition wall Q. Ceiling lined with white metal panels. R. Trim ceiling liner to accept future wall lining. S. Soffits shall be vented along with attic vents.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.