Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 26, 2024

December 31, 2025

IL-2

Demolition, New Construction, Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

IL-2, Rockford, IL

Our team is requesting plans for this project.

Subscribe to View Full Documents

The Complexity Factor for this project is 0. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. This project includes Phase III engineering services for construction contract 64K73, which includes the removal and replacement of the twin structures carrying IL2 over the Rock River in Rockton. The project includes use of temporary crossovers to stage traffic. The following structures are included in this project: S.N. 101-0125: IL 2 over Rock River S.N. 101-0126: IL 2 over Rock River The Consultant must provide sufficient staff to perform all engineering services required to complete the project in accordance with departmental policies. This may include, but is not limited to all on-site construction inspection, documentation of pay quantities and related forms for record keeping, use of Construction & Materials Management System (CMMS), on-site quality assurance material testing, geotechnical inspection, verification of construction layout including GPS work, submittal of pay estimates, change orders, and all other work required to complete the project in a timely manner. The Consultant will be responsible to ensure contractors complete the work in accordance with the plans and specifications. It is anticipated the department will do all off-site material inspection for the project. The Consultant will provide vehicles, cell phones, computers capable of running Construction & Materials Management System (CMMS) software and scanner, onsite testing equipment, tools of the trade, and any other equipment deemed necessary to complete the project in accordance with departmental policies. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS) The method of contractor selection has not been determined at this time. IDOT - 022 - RFP Engineering - IL 2 over the Rock River in Rockton, Phase III Project

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.