Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
February 23, 2024
February 23, 2029
US-12
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - State/Provincial
US-12, Wauconda, IL
Plans and Specifications are not available for this project. If that changes, they will be made available here.
The Complexity Factor for this project is 0.035. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on November 2, 2023, at 9:30 AM at the Region One/District One Office in Schaumburg. Phase III engineering services are required to provide SMART resurfacing along US-12. Work included, but is not limited to, road surface removal, HMA paving, removal and replacement of combination concrete curb and gutter, adjustment of drainage structures, placement of pavement markings, guardrail removal and replacement, aggregate shoulder placement, shoulder grading and all incidental and collateral work necessary to complete the project as shown on the plans described here in. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 14 - RFQ - US 12 (Rand Rd) from State Park Rd/East St to S of Fox Lake Rd/US 12 from IL 31 (Tyron Grove Rd) to State Park Rd
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Wauconda, IL
Bid Date: Mar 21 2023
Wauconda, IL
Bid Date: Aug 19 2021
Zion, IL
Bid Date: Jun 11 2025
Machesney Park, IL
Bid Date: Aug 02 2023
Mount Morris, IL
Bid Date: Aug 03 2023
Hillsboro, IL
Bid Date: Aug 03 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
