Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
February 23, 2024
February 23, 2026
IL 38
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - State/Provincial
IL 38, Schaumburg, IL
Plans and Specifications are not available for this project. If that changes, they will be made available here.
The Complexity Factor for this project is 0.035. This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 25, 2023, at 10:00 AM at the Region One/District One in Schaumburg. This project includes reconstruction and widening, traffic signal modernization, and drainage improvements, along IL 38 from Wynwood Road to Pierce Avenue in the Village of Winfield. This includes the full reconstruction and widening of the intersections at County Farm Road and Winfield Road to accommodate for additional turn lanes. The profile is expected to be modified and the two existing structures carrying IL 38 and Shaffner Road, respectively, over Winfield Creek are anticipated to be replaced by a single double cell box culvert. The project is expected to include the addition of east bound dual left turn lanes and a west bound right turn lane at the intersection of IL 38 and County Farm Road, as well as a west bound left turn lane at Shaffner Road. The project also includes resurfacing from Fapp Circle to Pierce Avenue. The project is also anticipated to include traffic signal modernization and installation of barrier median along IL 38 to improve access control. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 15 - RFQ - IL 38 from Wynwood Road to Pierce Avenue, Phase II Project
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Schaumburg, IL
--
Schaumburg, IL
--
Schaumburg, IL
Bid Date: Aug 04 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
